You don't have javascript enabled. Good luck with that.
Pencarian
 12 PPSU Cilangkap Bersihkan Saluran Phb Kali Tengah
.
photo Nurito - Beritajakarta.id

Connecting Channel of Kali Tengah Cilangkap Dredged

Tens of PPSU personnel of Cilangkap Urban Village dredged connecting channel of Kali Tengah. The effort is done based on report and complaint from local residents.

Today we deploy 12 PPSU personnel cleaning the channel from mud and trash

Cilangkap Urban Village Head, Dwi Ispuranto said, the cleaning project is focused at Jalan Masjid Al Khoir and Jalan Wira Kencana IV-V. Based on citizens report, settlement at RT 01, 03, and 08 and RT 06 RW 02 Cilangkap is usually flooded if the channel is overflowing.

“Today we deploy 12 PPSU personnel cleaning the channel from mud and trash,” he said, Saturday (7/23).

51 Connecting Channels in C. Jakarta Dredged

According to him, the channel already faces shallowing. It must be dredged totally. It means East Jakarta Sub-dept. of Water Management role is needed.

Chairman of RT 03/02 Cilangkap, Suparto, admitted the flood could reach 50-69 cm

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1037 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye903 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye545 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye447 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing